Resorts World Catskills

Commissioning

Monticello, NY


Project Highlights

M/E Engineering completed Fundamental Commissioning services and also provided LEED certification services associated with all M/E/P related prerequisites and credits for Resorts World Catskills.


Services Provided

1150 Ton Chillers
1150 Ton Cooling Towers
Water Loop Fluid Cooler
Condenser Water Pumps
Chilled Water Pumps
Hot Water Pumps
Condensing Heating Boilers
Plate & Frame Heat Exchanger
Exhaust Fans
Heat Recovery Units
Air Handling Units
Swimming Pool Heat Recovery Units
Kitchen Make-Up Air Units
Electric Unit Heaters
Garage Unit Heaters
Hot Water Unit Heaters
Cabinet Unit Heaters
Emergency Generators
Blower Coils
Parking Garage Exhaust Fans
Stairwell Pressurization Fans
Rooftop Exhaust Fans
Fan Coil Units (Sampling of 20%
Units Installed)
Air and Water System Testing and Balancing
Direct Digital Controls
Variable Air Volume Terminal Units
Computer Room Air Conditioning Units
Lighting System Controls
Domestic Water Heat Exchangers
Domestic Hot Water Circulating Pumps

 

Commissioning Services Addressed the Following

Development of a Commissioning Specification for inclusion in Contract Documents
Development of a Commissioning Plan
Development of a Prefunctional Checklists & Functional Test Procedures
Maintain an Issues and Resolutions Log
Completion of Functional Performance Testing (on-site commissioning)
Confirmation of direct digital control system operation and capabilities
Final Commissioning Report