Harris Corporation

Xavier Project - JROC

Rochester NY


Project Highlights

Complete MEP upgrades to an aging 573,000 SF facility to allow Harris to consolidate three (3) existing manufacturing facilities under a single roof  The updated facility is a "focus factory" manufacturing environment with a 200,000 SF static controlled flexible electronic manufacturing space, support offices, R&D labs, warehouse, distribution and customer product service areas,  This approach allows for improved efficiency and faster delivery of Harris systems that are deployed around the world.

The MEP systems range from state-of-the-art temperature and humidity control for the electronic manufacturing space to large open warehouse parts/product storage areas.  Upgrades to the 2,800 ton central chilled water plant included variable speed primary/secondary pumping, looped chilled water piping and modifications to allow for 500 tons of "free cooling" during the winter.  A looped duct system in the manufacturing area allows for energy savings during low load periods and redundancy in the event of a unit failure.

Sectors


Have a question or want to discuss a project? contact us